* frame width has been reduced in order to leave more space and have sunken buttons somewhat accessible * the cutout for neutrik mounts has been reduced and moved into the holes themselves, to do this more modularly and restore some support
676 B
676 B
TODO
Notes for "next time".
v2
- I need at least 5mm, maybe 10mm, more height, to fit some of my levers like the Nobi Bullet
- I couldn't even fit a JLF without the compensations in v1 on the bottom panel
- I had to bend the pins a bit on Crown SDB-202s, too
- The plates bow a bit on the top when pressure is applied, because there's no support from the frame up there --- adding 5mm to the frame should leave a couple mm for support to get added back
- PCB mount on
top-panel-dir_arc-plus-w-30mm-plus-one-with-mount.scad
doesn't leave room for a USB cable on the right hand side - Engraving some cosmetic stuff? Or maybe a place to mount other plates?